Quantity takeoff
Measured quantities organized by the agreed trade and system. Your team supplies or confirms pricing, production rates and final markups. Specify any drawing markups and workbook format you need.
Review quantity takeoff scope →Conceptual, schematic and design-development MEP budgets for contractors working with evolving drawings. Track quantity assumptions, equipment allowances, exclusions and milestone changes before progressing to a detailed bid estimate.
Project-based estimating fees. Confirm scope, fee and delivery after document review.
Tell us the project location, trade scope and whether you need quantities only or a priced estimate. Add your bid deadline if you have one.
Upload the available set, or include a shared drawings link in your message. Note missing documents and any items you want excluded.
We review the available documents and clarify the requested package. The proposal establishes deliverables, fee, revision scope and delivery milestones before estimating work starts.
Review estimating fees and scope questions or call (317) 751-5969.
In design-build and Progressive Design-Build (PDB) project delivery, contractors must commit to budgets and Guaranteed Maximum Price (GMP) thresholds long before 100% construction drawings exist.
At JLG Estimating, our design build mechanical estimating services bridge the gap between architectural intent and physical construction costs. By evaluating building geometry, occupancy type, HVAC load parameters, and plumbing fixture densities, we develop defensible conceptual budgets and provide milestone reconciliation as the design matures from sketches to stamped engineering documents.
All early-stage estimates clearly identify engineering assumptions, system capacities, equipment allowances, and recommended design contingencies—so the bid team can review how the budget changes as drawings develop.

We provide progressive estimating models that advance alongside design development milestones.
Developed from space programs, preliminary floor plans, and narrative project criteria.
Single-line duct runs, major equipment schedules, and preliminary utility incoming services.
Coordinated double-line layouts, valve schedules, and developed electrical/mechanical interfaces.
Full 90–100% construction documents with sealed engineering sheets and front-end contract specs.
We provide objective, data-backed cost alternatives that lower capital cost without sacrificing performance.
Evaluating rooftop packaged heat pumps, VAV systems, four-pipe fan coils, and Variable Refrigerant Flow (VRF) to balance equipment cost against installation labor and ceiling plenum space constraints.
Direct First-Cost & Labor ModelingComparing grooved mechanical joints versus traditional welded steel piping for hydronic and condenser water systems, quantifying shop pre-fabrication savings and reduction in hot-work field labor.
Field Hours vs. Fitting CostsAnalyzing copper versus PEX potable water risers and branch lines, cast iron versus PVC DWV systems (where code permitted), and common-venting layouts to trim material expenditure.
Code Compliance & Material DeltasLet JLG Estimating build a reliable conceptual model or milestone budget check to support your preconstruction team.
How our structured preconstruction estimates protect contractors against common design-build liabilities.
| Risk Area | Design-Build Challenge | JLG Estimating Control Process |
|---|---|---|
| Unspecified Equipment Efficiencies | Architect notes general cooling; local energy code mandates high SEER/IEER ratings requiring premium equipment. | We reference baseline ASHRAE 90.1 / IECC code standards applicable to the project jurisdiction and budget compliant equipment ratings. |
| Electrical Coordination Grey Areas | Mechanical equipment sizes shift between SD and DD, altering motor horsepower and electrical disconnect amperages. | We track equipment schedule updates and notify your team when motor load changes necessitate electrical coordination. |
| Acoustic & Vibration Criteria | Rooftop units positioned over sensitive spaces require unbudgeted spring isolators and heavy-gauge acoustic casing. | We evaluate structural proximity to occupied spaces and include line items for necessary vibration isolation packages. |
| Plumbing Fixture Unit Deficits | Architectural occupant loads increase, triggering additional fixture counts and larger domestic water meter services. | We re-tally fixture unit totals at each milestone to confirm pipe service sizing remains aligned with municipal utility connections. |
The core danger in design-build preconstruction is unchecked scope creep. As an architectural concept evolves into schematic drawings, uncoordinated changes—such as higher glass-to-wall ratios, raised ceiling heights, or increased occupant densities—compound into major mechanical and electrical cost increases. We provide continuous preconstruction cost governance:
At each drawing handoff (SD to DD, and DD to CD), we generate a side-by-side variance matrix. We categorize cost movements into scope additions, market material shifts, and design refinements, clearly explaining to owners and GCs exactly why numbers shifted.
Rather than applying an arbitrary blanket contingency, we calibrate design contingencies dynamically: 15%–20% at conceptual feasibility, 10%–12% at schematic design, 5%–8% at design development, stepping down to 2%–3% at final GMP buyout.
If an evolving engineering design threatens the owner's target project pro forma, we prepare first-cost comparisons for alternatives identified with the project team. Lifecycle, energy-performance and design suitability conclusions require the relevant engineering inputs and agreed analysis scope.
Incomplete design documents require clear trade demarcation to prevent double-counting or missing scope between subcontractor bid packages:
We document equipment supply vs electrical hookup responsibilities for variable frequency drives (VFDs), combination starters, motorized smoke dampers, and emergency generator power feeds before trade contracts are issued.
Early schematic civil drawings frequently show domestic water and sanitary sewer stubbed at property lines. We define the exact building footprint interface so excavation, backfill, and utility piping are accurately allocated.
When building automation points lists are undefined, we record provisional controls allowances with their stated assumptions and flag the missing points list for confirmation by the project team.
Align project budgets with architectural design before drawings are stamped. Contact our commercial estimating team to review your conceptual scope.
Design-build and conceptual preconstruction requires dynamic milestone cost modeling, parametric benchmarking, and structured value engineering (VE) comparisons.
Delivered in unlocked Microsoft Excel workbooks and color-coded Bluebeam Revu markups. Review our Estimating Methodology and Sample Deliverables Guide:
Connect design-build conceptual modeling with tender closing and trade takeoff disciplines:
Hard-bid lump-sum tender pricing, general conditions, and proposal clarification letters.
Full itemized Bill of Quantities (BOQ) and Bluebeam vector markups for buyout.
Mechanical basis of design budgeting, VRF vs. RTU lifecycle cost comparisons.
Service entrance sizing, one-line diagrams, and lighting power density modeling.
Common questions regarding our design-build & conceptual mep estimating.
The right package depends on who will price the quantities and prepare the final bid. Confirm the included work in your project proposal.
Need to review the output first? See the takeoff workbook fields and deliverables and estimating methodology, then send your project details.