Commercial MEP Takeoff Deliverables

Know what to ask for in your estimating package. This guide explains workbook fields, drawing references and scope notes for mechanical, electrical and plumbing bids.

What belongs in an editable quantity workbook?

Agree the required fields before takeoff starts. A quantity-only workbook lists measured work; a priced estimate adds the cost inputs and calculation basis included in the proposal.

Workbook fields to specify in your proposal
FieldPurposeReview question
System, location and cost codeKeep floors, phases and bid packages separate.Can your team reconcile the totals to its bid form?
Description, size and materialDistinguish specification and installation differences.Are assemblies with different materials or joint methods separate?
Quantity and unitRetain counts, lengths, areas and weights as separate measurements.Are allowances shown separately from measured quantities?
Drawing and revision referenceTrace the line item to the document issue reviewed.Can a reviewer find the source sheet and relevant addendum?
Pricing and labor inputsRecord the agreed quote, rate or allowance basis when pricing is included.Which inputs are contractor supplied, and which need confirmation?

Marked-up drawings and scope notes

Request a consistent color legend and system separation for marked-up PDFs. The scope notes should identify reviewed documents, included systems, exclusions, unresolved questions and revision limits. A drawing reference supports review; it does not replace the design team's drawings or the contractor's final bid check.

Choose the trade package you need

For your own bid, send current drawings, specifications, requested trades and deadline. The proposal confirms the files, fields, review scope, fee and delivery milestones. Request a project proposal.