Office Fit-Outs, Retail & Interior Refits

Commercial Tenant Improvement (TI) MEP Estimating

Plan-based quantity takeoffs and pricing for interior commercial renovations, office build-outs, retail fit-outs, and core & shell modifications nationwide.

Estimating scope guide • Project-document based review

What Is Included in a Commercial Tenant Improvement (TI) MEP Takeoff?

A commercial tenant improvement (TI) MEP takeoff quantifies interior alteration scopes for corporate offices, retail spaces, restaurants, and medical suites. It segregates demolition from new work, quantifying VAV box relocations, flexible duct runouts, linear slot diffusers, core-drilled restroom and breakroom plumbing tie-ins, lighting control sensors, and underfloor electrical raceways. Confirm applicable energy-code details in the project documents with the design team.

Scope of Work

Commercial TI Trade Disciplines

Clear scope demarcation between base-building core & shell infrastructure and tenant fit-out packages.

Interior HVAC Alterations (Div 23)

Quantification of medium-pressure duct modifications, terminal VAV box relocations, thermostat wiring, and new air distribution patterns.

  • Existing VAV box relocations, recalibrations & new reheat coils
  • Flexible duct runouts (insulated R-6/R-8) and spin-in collars
  • Linear slot diffusers, 2x2 supply grilles & eggcrate returns
  • Exhaust fan tie-ins for conference rooms and copy centers

Power, Lighting & Controls (Div 26)

Complete electrical build-out including architectural lighting packages, daylight harvesting sensors, floor poke-throughs, and sub-panels.

  • IECC / Title 24 vacancy sensors, photocells & dimming packs
  • Commercial architectural LED fixtures, downlights & track lights
  • Poke-through floor boxes, power poles & modular furniture feeds
  • Tenant sub-panels, dedicated server room circuits & TV raceways

Restroom & Breakroom Plumbing (Div 22)

Takeoffs for core-drilled slab penetrations, ADA-compliant commercial restroom additions, breakroom sinks, and water heater arrays.

  • Core drilling, firestop collars & horizontal waste below slab
  • Breakroom sink, dishwasher, ice-maker & instant hot water hookups
  • Commercial water closet, urinal & ADA lavatory additions
  • Domestic water submetering and backflow preventer installations
Interior Standards

Referenced Commercial Interior Codes & Standards

Our tenant improvement takeoffs reflect specified energy conservation details and architectural layout requirements.

International Energy Conservation Code (IECC) ↗ASHRAE Standard 90.1 Energy ↗ADA Accessibility Guidelines ↗SMACNA Duct Renovation Standards ↗
Technical Benchmarks

Commercial TI Quantification & Specification Matrix

Engineering parameters and scope demarcation criteria for commercial interior fit-outs.

TI Scope AreaCSI MasterFormatDemolition vs. NewGoverning CodeQuantification Unit
VAV Relocations & Flex DuctDiv 23 36 00Isolated Dual-Layer TrackingSMACNA GuidelinesBox count (EA), Linear Feet (LF) flex duct
Lighting Controls & SensorsDiv 26 09 23Full Modernization TakeoffASHRAE 90.1 / IECCOccupancy sensors (EA), dimmers & NLC packs
Core-Drilled RestroomsDiv 22 13 00New Core & Base Stack Tie-InADA / IPC CodesCore penetrations (EA), firestops, fixtures
Poke-Through Floor PowerDiv 26 05 33Furniture System InterfaceNECA MLU StandardsFloor boxes (EA), conduit LF, circuit home runs
Selective Demolition Breakdown
Clear segregation of demolition tasks (fixture caps, duct removal, wiring make-safe) from new fit-out scope items.
Project-specific delivery schedule
Estimating support for compressed bid schedules typical of corporate commercial tenant interiors, with milestones discussed after scope review.
Energy Code Compliance
Granular quantification of automated lighting controls, daylight harvesting photocells, and continuous 0-10V dimming stations.
Bid Schedule Coordination

What You Receive in Your TI Bid Package

  • Color-coded demolition vs. new work drawing markups for clear scope demarcation:
  • Itemized fixture, device, and diffuser schedules cross-referenced to existing building tie-in points:
  • Project-specific delivery milestones discussed around the bid deadline:
  • Ready-to-submit Excel bid workbooks with labor and material breakdowns:
  • Segregated Demolition & New Work Markups: Bluebeam plan markups clearly differentiating demo scopes from new equipment installations.
  • Delivery milestones: Discussed after reviewing the project scope, drawing set, and requested bid deadline.
FAQ

Commercial TI Estimating Questions

Frequently Asked Questions

Delivery milestones are discussed after reviewing the drawing set, project scope, and requested bid deadline.

Need a Commercial TI MEP Estimate?

Send us your office, retail, or restaurant fit-out drawings to discuss scope, deliverables, and project-specific delivery milestones.

Upload TI PlansCall +1 (317) 751-5969
Illustrative worked example

Tenant improvement example: distinguish reuse from new work

A synthetic fit-out drawing shows 10 existing diffusers: 6 remain in place and 4 are relocated. It also schedules 3 new diffusers. The estimating schedule should preserve those different work operations.

Educational example — not a completed client deliverable
OperationExample countTakeoff treatment
Remain in place6 EAIdentify retained scope
Relocate4 EARemoval/reinstallation and revised connections
New3 EANew supply and installation scope

There are 13 final diffuser locations in the example, but only 3 newly supplied units. Price relocation and duct/controls changes from the documented work rather than treating every final location as a new equipment purchase. Record survey assumptions when existing conditions are not confirmed.

Check quote scope for renovation packages →