Commercial Electrical Estimating Services

Itemized quantity takeoffs, conduit run measurements, switchgear quantification, and bid assembly support for commercial electrical contractors bidding institutional, healthcare, retail, and industrial facilities nationwide.

Project-based estimating fees. Confirm scope, fee and delivery after document review.

CSI Division 26 ScopeColor-Coded Circuit MarkupsFeeders, Branch & Switchgear
Send your bid documents

Request an electrical estimate

Tell us the project location, trade scope and whether you need quantities only or a priced estimate. Add your bid deadline if you have one.

Useful documents for a scope review

  • Electrical plans, one-lines and panel/lighting schedules
  • Power, lighting, grounding and controls specifications
  • Equipment connections, low-voltage boundaries and addenda

Upload the available set, or include a shared drawings link in your message. Note missing documents and any items you want excluded.

What happens next?

We review the available documents and clarify the requested package. The proposal establishes deliverables, fee, revision scope and delivery milestones before estimating work starts.

Review estimating fees and scope questions or call (317) 751-5969.

Request a Project Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Loading the drawing uploader…

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

Prepare a bid you can review

Electrical Takeoff Package: What to Request

For electrical subcontractors outsourcing a commercial takeoff, the useful output is a traceable schedule your team can price and check. Reconcile one-lines, panel schedules and floor plans so feeder scope, branch routing and equipment connections remain distinct.

Electrical scope and workbook fields to agree before takeoff
PackageQuantity breakdownCheck before pricing
Distribution and feedersGear and panel tags, feeder/raceway lengths and conductor groupsTermination scope, routing assumptions and vendor quotations
Lighting and branch devicesFixture/device counts by type, circuits, conduit and wiringControls, emergency functions and scheduled accessories
Equipment and low voltageDisconnects, hookups and documented pathways or devicesDivision 23/26 interfaces, owner-furnished items and low-voltage exclusions

A scope gap to check

Lighting fixture counts cannot establish conductor lengths or branch conduit. Keep counts, routed measurements and any missing-route assumptions visible in separate rows.

Need material quantities for your own pricing? Choose a quantity-only takeoff. Need labor and cost inputs assembled with quantities? Review priced bid estimating. Identify the intended package in your enquiry so the proposal covers the work you need.

MEP drawing revision and addendum checklist → · Fees and revision scope · Send your project documents

Comprehensive Division 26 Coverage

Itemized Commercial Electrical Takeoffs

Commercial electrical bids demand meticulous counting of distribution gear, precise linear measuring of conduit runs, and identification of the specified conductor sizes. JLG Estimating delivers granular, itemized electrical takeoffs that support review of scope coverage before bid day.

Our senior estimators thoroughly analyze electrical floor plans, single-line diagrams, riser schematics, and mechanical equipment schedules. We provide color-coded blueprint markups and customizable Excel spreadsheets calibrated to your shop's labor productivity and regional supply rates.

Commercial Electrical Service Room Switchgear and Conduit Runs Takeoff

Power Distribution & Gear

Complete quantification of main service entrance equipment, secondary distribution, and transformer banks:

  • Main switchboards & unit substations
  • Distribution panelboards & circuit breakers
  • Dry-type step-down transformers & K-rated gear
  • Automatic transfer switches (ATS) & generator feeds

Conduit & Feeder Raceways

Accurate linear measurements of all underground and overhead raceways, wire sizes, and cable trays:

  • EMT, GRC, IMC, and PVC conduit linear footage
  • Copper & aluminum THHN/XHHW feeder conductors
  • MC cable footages & junction box counts
  • Cable tray, trapeze hangers & seismic bracing

Lighting & Advanced Controls

Itemized counts and classification of commercial architectural, emergency, and site lighting:

  • Commercial 2x4, 2x2 LED troffers & downlights
  • High-bay industrial LED fixtures & strip lights
  • 0-10V low voltage dimming & occupancy sensors
  • Emergency battery packs & exit signs
Distribution Engineering

One-Line Diagram Reconciliation & Feeder Scheduling

Commercial electrical bids depend fundamentally on single-line diagram accuracy. While 2D plan sheets show device placement, the single-line diagram dictates the actual electrical infrastructure, main bus ratings, breaker capacities, and feeder conductor sizing:

1. Service Entrance & Fault Current Coordination

We verify main service ampacity (400A to 4000A+), utility transformer pad details, current transformer (CT) metering cabinets, and grounding electrode conductor networks (ground rods, ground rings, and building steel bonding). We check specified AIC ratings (e.g. 65kAIC vs 22kAIC) to prevent catastrophic equipment pricing shortfalls.

2. Feeder Conduit & Conductor Takeoff

Feeder takeoffs include documented horizontal routes, vertical risers and separately stated routing allowances. Pull boxes, bends, conductor sizes and copper/aluminum specifications are taken from the project documents. Missing routing or sizing information is listed for clarification; no universal 100-foot pull-box rule or independent conductor redesign is assumed.

3. Panelboard Schedules & Branch Circuit Verification

We cross-reference every circuit breaker listed in the panel schedules against branch circuit homeruns on the plan drawings, identifying unassigned circuits, spare breaker allowances, and space-only provisions.

MEP Coordination

HVAC Motor Hookups & Low-Voltage Demarcation

Scope overlap between commercial electrical subcontractors and mechanical trades is the number-one source of bid-day scope gaps. Our takeoffs establish clear boundaries:

Mechanical Equipment Power Connections

We review the Division 23 mechanical equipment schedule to quantify disconnect switches (fused vs non-fused, NEMA 3R outdoor vs NEMA 1 indoor), variable frequency drives (VFDs), motor starters, and final flexible conduit whip hookups for RTUs, exhaust fans, and chillers.

Architectural Lighting Control Systems

Energy code mandates (ASHRAE 90.1 / Title 24 / IECC) require complex digital lighting control systems. We quantify relay panels, 0-10V low-voltage dimming cabling, ceiling occupancy/vacancy dual-technology sensors, photocells, and emergency shunt relays.

Fire Alarm & Telecommunications Pathways

We capture empty conduit pathways, backboxes with pull strings, floor poke-through assemblies, and J-hook cable support infrastructure required for low-voltage, security, and fire alarm packages.

Professional Preconstruction Deliverables

Possible Takeoff Deliverables

Our deliverables are tailored for immediate bid assembly. We provide transparent, fully editable files that your estimators and project managers can adapt with complete flexibility.

Editable Excel Workbook

Itemized quantities broken down by floor, drawing sheet, and CSI cost code. Includes material unit prices and customizable labor unit hours tailored to open-shop or prevailing wage standards.

Color-Coded Marked-Up PDFs

High-resolution digital blueprint overlays highlighting every feeder route, branch conduit run, lighting symbol, and panelboard location. Allows for instant visual auditing by your team.

Scope & Clarifications Letter

A formal preconstruction letter documenting drawing dates, addenda reviewed, engineering assumptions made, and explicit scope boundaries ready to paste into your GC bid proposal.

Sector Expertise

Commercial Facility Sectors We Estimate

Our estimators support commercial electrical subcontractors across diverse facility types nationwide.

Corporate & Office (TI)

High-density power distribution, architectural lighting controls, floor box layouts, and tenant fitouts.

Office TI Scope →

Healthcare & Medical

Isolated power systems, emergency branch circuits, nurse call raceways, and hospital-grade branch devices.

Healthcare Scope →

Industrial & Logistics

Heavy motor control centers, high-bay warehouse LED lighting, 480V distribution, and busway systems.

Industrial Scope →

Data Centers

Medium-voltage switchgear, standby generators, UPS modules, and overhead busway distribution.

Data Center Scope →
Division 26 Preconstruction

Electrical Drawing Intake & Deliverables Architecture

Commercial electrical estimating demands meticulous coordination between one-line feeder diagrams, branch conduit routing, panelboard schedules, and lighting fixture schedules.

Electrical Drawing Intake Checklist

  • ✓E-Series Plan Sheets (PDF): Electrical power plans, lighting layouts, site electrical utilities, and system details.
  • ✓One-Line Diagrams & Panel Schedules: Main service entrance, main distribution panels (MDP), transformers, panelboards, and motor control centers (MCC).
  • ✓Lighting Fixture Schedules & Cut Sheets: Luminaire tags, daylight sensors, emergency lighting battery packs, and occupancy control matrices.
  • ✓CSI Division 26 Specifications: Conduit specifications (EMT, RMC, PVC, MC cable), conductor specs (copper vs. aluminum), and switchgear manufacturer requirements.

Deliverable Package Architecture

Delivered in unlocked Microsoft Excel workbooks and color-coded Bluebeam Revu markups. Review our Estimating Methodology and Sample Deliverables Guide:

  • Tab 1 — Executive Summary: Bid summary recap, switchgear totals, branch conduit, lighting, and labor.
  • Tab 2 — Feeders & Heavy Distribution: Conduit linear runs, conductor footage by AWG/kcmil, trenching, and terminations.
  • Tab 3 — Branch Circuitry & Devices: Receptacles, switches, motor feeds, junction boxes, and MC cable runs.
  • Tab 4 — Lighting Package & Controls: Fixture schedule counts, emergency lighting, sensors, and 0-10V dimming.
  • Tab 5 — Switchgear Leveling: Vendor comparison sheet for panelboards, switchboards, and dry-type transformers.
  • Tab 6 — NECA Labor Factoring: NECA Manual of Labor Units adjusted for installation height and site conditions.
Trade Interconnects

Coordinated MEP Preconstruction Solutions

Coordinate electrical packages with mechanical and preconstruction estimating scopes:

Commercial HVAC

Coordination of line-voltage disconnects, motor starter panels, and VFD wiring schedules.

HVAC Scope →

Plumbing Takeoffs

Power circuit coordination for electric water heaters, circulating pumps, and sewage ejectors.

Plumbing Scope →

Quantity Takeoffs

Itemized conduit linear runs, wire footages, and panelboard device takeoffs for buyout.

Quantity Takeoffs →

Bid Estimating

Complete tender closing support, NECA labor factoring, and scope clarification letters.

Bid Estimating →
Common Questions

Commercial Electrical Estimating FAQ

Answers to common preconstruction and takeoff questions from electrical contractors.

Frequently Asked Questions

A standard commercial electrical takeoff includes linear footages of all conduit runs (EMT, rigid, PVC, MC cable) categorized by trade diameter, wire and feeder footages by gauge and insulation type, distribution switchgear, panelboards, dry-type transformers, motor control centers (MCC), commercial lighting fixtures and controls, branch receptacles, disconnect switches, and equipment hookups.

Ready to Submit Your Electrical Drawings for Takeoff?

Upload your plans, specifications, and addenda. Our preconstruction estimators review the scope and prepare a fixed-fee proposal with deliverables, fee, and proposed delivery milestones.

Submit Drawings for Quote →Call Estimating Desk: +1 (317) 751-5969
Choose your estimating scope

Quantity Takeoff or Priced Estimate?

The right package depends on who will price the quantities and prepare the final bid. Confirm the included work in your project proposal.

Quantity takeoff

Measured quantities organized by the agreed trade and system. Your team supplies or confirms pricing, production rates and final markups. Specify any drawing markups and workbook format you need.

Review quantity takeoff scope →

Priced estimating support

Request quantities with the material, labor and other cost inputs agreed for your project. Identify supplier quotes, allowances, exclusions and the pricing basis before relying on the totals.

Review bid estimating scope →

Fees, deadlines and revisions

The drawing set, trade complexity, output format and required delivery date affect the proposal. New addenda and design changes should be assessed separately from corrections to an agreed scope.

See fee factors and revision questions →

Electrical scope to confirm before pricing

  • Provide current one-line diagrams, panel schedules, fixture schedules and electrical specifications.
  • Define feeder, branch-circuit, lighting, site-power and mechanical-equipment connection boundaries.
  • Separate full low-voltage/fire-alarm systems from pathway-only takeoffs; identify owner-furnished equipment and vendor quotations.

Need to review the output first? See the takeoff workbook fields and deliverables and estimating methodology, then send your project details.