HVAC estimating
Mechanical system quantities aligned with the phase and plan issue supplied for bidding.
JLG Estimating provides remote commercial MEP takeoff and bid estimating support for contractors pricing Atlanta projects. Send the current architectural and MEP sheets, bid scope, specifications, and addenda; note which building phase and trade packages are included so quantities stay aligned with the set being priced.
The City of Atlanta's online permitting information lists separate drawing-file categories such as architectural, mechanical, electrical, and plumbing plans. The City page currently displays phasing guidance effective June 1, 2022: commercial-building phasing must be completed or requested before plans are routed for review; once routed, no phasing is accepted. Phasing must cover at least four floors (three permit floors plus one construction buffer floor), and no phasing is allowed after the building permit is issued. Capture the phase and discipline package boundaries when organizing a bid set, and confirm current instructions with the City; these rules are not requirements for nearby jurisdictions.
Jurisdiction note: The cited upload and phasing information is from City of Atlanta online permitting materials. Confirm current phasing instructions and whether the City process applies to the address; these materials do not establish jurisdiction for all Atlanta-area addresses or determine which permits a project needs.
Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.
Mechanical system quantities aligned with the phase and plan issue supplied for bidding.
Duct quantities by the identified mechanical package and current sheet set.
Fixture and piping quantities within the stated phase and trade boundary.
Electrical quantities connected to the current drawings and bid package.
Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.
Read the estimating methodology · See illustrative deliverable structure
Provide the project address, phase or package boundary, current discipline sheets, specifications, bid instructions, and all addenda. Point out any later phase or scope excluded from the requested estimate.
No. The cited file categories and phasing information describe City of Atlanta processes. Confirm which permitting authority covers the actual project address.
No. JLG prepares estimates and takeoffs from the documents supplied. The contractor and project team determine application phasing and permitting requirements.
Send the project scope, current drawings, specifications, and addenda to discuss estimating support.
Contact JLG Estimating