Plumbing estimating
Vertical plumbing risers, fixture counts, and storm drainage.
JLG Estimating provides remote commercial MEP takeoff and bid estimating support for contractors bidding projects across New York City. Send current architectural and MEP drawings, specifications, and addenda; JLG delivers organized quantity takeoffs and does not replace the registered design professional or NYC DOB plan examiner.
The NYC Department of Buildings (DOB) enforces the 2022 NYC Construction Codes and Local Law 97 carbon emissions limits. Commercial plan filings through DOB NOW: Build differentiate alterations from new buildings. For estimators, key intake factors include vertical riser expansion joints, vibration isolation for multi-story towers, acoustic sound criteria, and DEP sewer tie-in boundaries.
Jurisdiction note: The cited references describe NYC DOB and DOB NOW procedures. This page provides estimating support from contractor-provided documents and does not interpret code or certify compliance.
Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.
Vertical plumbing risers, fixture counts, and storm drainage.
Mechanical equipment, central plant chillers, and fan coils.
High-pressure hydronic loops, steam headers, and riser piping.
Power distribution, switchgear, and emergency standby systems.
Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.
Read the estimating methodology · See illustrative deliverable structure
No. JLG provides quantity takeoffs and cost estimating from the supplied plan set. Filings and special inspections remain with the project team.
We measure pipe footages floor-by-floor from riser diagrams, itemizing expansion loops, guides, anchors, isolation valves, and fire pump connections.
Provide the current architectural, structural, and MEP drawing set, mechanical equipment schedules, specifications, and all issued addenda.
Send the project scope, current drawings, specifications, and addenda to discuss estimating support.
Contact JLG Estimating