Remote estimating support

Commercial MEP Estimating Support for New York City Projects

JLG Estimating provides remote commercial MEP takeoff and bid estimating support for contractors bidding projects across New York City. Send current architectural and MEP drawings, specifications, and addenda; JLG delivers organized quantity takeoffs and does not replace the registered design professional or NYC DOB plan examiner.

Request plan-based quantities or priced estimating support for your bid package. Fees for most New York City commercial estimates fall between $150 and $1,000. Turnaround is typically 24–48 hours, scaled to the size and scope of the job. Start with the scope and fee guide and the drawing-revision checklist.

Answer first

What this New York City estimating page covers

Service, audience, and inputs

Remote commercial MEP estimating and quantity takeoff support for contractors bidding projects in New York City. Start with the project address, requested trades, current drawings, specifications, schedules, bid instructions, and addenda.

Scope boundary

JLG measures and organizes the agreed estimating scope from supplied project documents. JLG does not determine the permitting jurisdiction, design systems, certify code compliance, submit permits, or imply a local New York City office or field team.

Local bid-set context

Information to confirm before a New York City estimate

The NYC Department of Buildings (DOB) enforces the 2022 NYC Construction Codes and Local Law 97 carbon emissions limits. Commercial plan filings through DOB NOW: Build differentiate alterations from new buildings. For estimators, key intake factors include vertical riser expansion joints, vibration isolation for multi-story towers, acoustic sound criteria, and DEP sewer tie-in boundaries.

Context typeHow to use it for estimating
State requirementUse the parent New York estimating hub for sourced statewide context; confirm the applicable edition for the project.
City / AHJ requirementThe cited New York City material applies only when that authority and review path govern the project. Confirm the address and project type first.
Utility requirementDo not assume a utility scope. Include it only when the bid documents or the responsible utility identify the interface.
General construction contextTreat market or project-type observations as intake context, not as code or permit requirements.
  1. Confirm the borough, block, and lot (BBL) address and whether the submission is filed through NYC DOB NOW: Build as an Alteration or New Building.
  2. Review Local Law 97 building emissions criteria and NYC Energy Conservation Code schedules to identify specified high-efficiency heat pumps or energy recovery equipment.
  3. Measure vertical high-rise piping risers with separate line items for pipe expansion joints, riser clamps, spring vibration isolators, and pressure-reducing valve stations.
  4. Segregate inside-building drainage from NYC Department of Environmental Protection (DEP) street sewer connection permits and water meter vaults.

Jurisdiction note: The cited references describe NYC DOB and DOB NOW procedures. This page provides estimating support from contractor-provided documents and does not interpret code or certify compliance.

Commercial MEP estimating

Related estimating scopes

Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.

HVAC estimating

Mechanical equipment, central plant chillers, and fan coils.

Related project-type resources

Back to the New York regional hubEstimating methodologyTakeoff deliverable guide
Remote bid support

How to prepare a New York City MEP estimate request

Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.

Include with the request

  • Project address, known permitting jurisdiction, bid deadline, and requested trade scopes.
  • Current architectural and MEP drawings, specifications, schedules, bid instructions, and issued addenda.
  • Scope boundaries and exclusions, including any site utility or fire-protection items that are outside the requested package.
  • Any scope questions or document conflicts you want identified for clarification.

Review and delivery

  1. Check the received document list and revisions against the bid set.
  2. Measure the requested quantities from the applicable plans and schedules.
  3. Flag unclear scope, mismatched schedules, or addenda changes for review.
  4. Use the estimating methodology and sample deliverables pages to review the stated workflow and illustrative file structure.

Read the estimating methodology · See illustrative deliverable structure

Common questions

New York City estimating FAQs

Does JLG handle NYC DOB permit filings or special inspections?

No. JLG provides quantity takeoffs and cost estimating from the supplied plan set. Filings and special inspections remain with the project team.

How do you quantify high-rise MEP risers in NYC?

We measure pipe footages floor-by-floor from riser diagrams, itemizing expansion loops, guides, anchors, isolation valves, and fire pump connections.

What information is needed for a New York City commercial takeoff?

Provide the current architectural, structural, and MEP drawing set, mechanical equipment schedules, specifications, and all issued addenda.

Have a commercial MEP bid set to review?

Send the project scope, current drawings, specifications, and addenda to discuss estimating support.

Contact JLG Estimating