Plumbing estimating
Fixture schedules, piping scope, and utility boundaries.
JLG Estimating provides remote, plan-based commercial MEP takeoff and bid estimating support for contractors bidding projects in Dallas. Send the current drawings, specifications, bid scope, and addenda; JLG organizes estimating work from those documents and does not replace the design professional or Dallas plan reviewer.
Dallas publishes current construction codes and commercial project checklists. Its commercial addition and first-time finish-out checklist requests project facts such as occupancy/use, stories, building area, zoning, and energy-code information; the checklist also says IECC compliance must be demonstrated separately through a City-registered third-party energy inspector. The checklist is scoped to the listed project type, so it should be treated as an example of useful bid-set context, not a universal requirement for every Dallas job.
Jurisdiction note: Dallas code and checklist sources are project- and date-sensitive. This estimating page does not interpret code, certify compliance, or determine whether a specific checklist applies; confirm current requirements with the City of Dallas and the responsible design professional.
Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.
Fixture schedules, piping scope, and utility boundaries.
Mechanical equipment, ductwork, and piping takeoffs.
Power distribution, lighting, conduit, and equipment connections.
Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.
Read the estimating methodology · See illustrative deliverable structure
No. The cited City checklist is labeled for commercial additions and first-time finish-outs. Confirm the applicable forms and requirements for the actual project and permit path.
Provide the project address, occupancy or use, current MEP drawings and schedules, specifications, bid scope, addenda, and any energy-compliance documents included in the bid package.
No. JLG's role is estimating and quantity takeoff support based on supplied documents. Code interpretation and required energy certifications belong to the responsible design professionals and applicable authorities.
Send the project scope, current drawings, specifications, and addenda to discuss estimating support.
Contact JLG Estimating