HVAC estimating
Heat pump central plants, dedicated outdoor air systems (DOAS), and fan coils.
JLG Estimating provides remote commercial MEP takeoff and bid estimating support for trade contractors bidding projects in Seattle. Share your current plans, specifications, addenda, and requested trade scopes to receive a structured, plan-based preconstruction estimate in Microsoft Excel.
The Seattle Department of Construction and Inspections (SDCI) enforces the Seattle Construction Codes, including the Seattle Commercial Energy Code. Seattle mandates aggressive building electrification, prohibiting fossil-fuel space heating in most new commercial buildings and requiring heat pump water heating and DOAS energy recovery wheels. High regional seismic hazard (Seismic Design Category D) requires seismic restraint detailing across all MEP trades as engineered on project drawings.
Jurisdiction note: The cited material describes City of Seattle SDCI guidelines. Confirm current requirements and jurisdiction with SDCI and the project design professionals.
Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.
Heat pump central plants, dedicated outdoor air systems (DOAS), and fan coils.
Commercial plumbing fixtures, rainwater harvesting, and SPU utility boundaries.
SMACNA seismic duct bracing, air distribution, and sound silencers.
All-electric building power service sizing, panelboards, and branch wiring.
Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.
Read the estimating methodology · See illustrative deliverable structure
We itemize specified commercial heat pumps, dedicated outdoor air systems (DOAS), heat recovery wheels, and electric domestic water heaters directly from the drawings.
No. JLG provides remote quantity takeoff and estimating support based on supplied drawings. Engineering calculations and permits belong to the project engineers.
Provide the complete architectural and MEP drawings, specifications, equipment schedules, addenda, and any documented SPU utility connection interfaces.
Send the project scope, current drawings, specifications, and addenda to discuss estimating support.
Contact JLG Estimating