Remote estimating support

Commercial MEP Estimating Support for Seattle Projects

JLG Estimating provides remote commercial MEP takeoff and bid estimating support for trade contractors bidding projects in Seattle. Share your current plans, specifications, addenda, and requested trade scopes to receive a structured, plan-based preconstruction estimate in Microsoft Excel.

Request plan-based quantities or priced estimating support for your bid package. Most Seattle commercial packages are typically $150–$1,000 per estimate. Delivery for most estimates is 24–48 hours, depending on project size and scope. Start with the scope and fee guide and the drawing-revision checklist.

Answer first

What this Seattle estimating page covers

Service, audience, and inputs

Remote commercial MEP estimating and quantity takeoff support for contractors bidding projects in Seattle. Start with the project address, requested trades, current drawings, specifications, schedules, bid instructions, and addenda.

Scope boundary

JLG measures and organizes the agreed estimating scope from supplied project documents. JLG does not determine the permitting jurisdiction, design systems, certify code compliance, submit permits, or imply a local Seattle office or field team.

Local bid-set context

Information to confirm before a Seattle estimate

The Seattle Department of Construction and Inspections (SDCI) enforces the Seattle Construction Codes, including the Seattle Commercial Energy Code. Seattle mandates aggressive building electrification, prohibiting fossil-fuel space heating in most new commercial buildings and requiring heat pump water heating and DOAS energy recovery wheels. High regional seismic hazard (Seismic Design Category D) requires seismic restraint detailing across all MEP trades as engineered on project drawings.

Context typeHow to use it for estimating
State requirementUse the parent Washington estimating hub for sourced statewide context; confirm the applicable edition for the project.
City / AHJ requirementThe cited Seattle material applies only when that authority and review path govern the project. Confirm the address and project type first.
Utility requirementDo not assume a utility scope. Include it only when the bid documents or the responsible utility identify the interface.
General construction contextTreat market or project-type observations as intake context, not as code or permit requirements.
  1. Confirm the project is under Seattle Department of Construction and Inspections (SDCI) review and subject to the Seattle Energy Code.
  2. Verify all-electric heating and heat pump central plant specifications, itemizing DOAS energy recovery ventilators, air-to-water heat pumps, and electric service connections.
  3. Quantify Seismic Design Category D seismic trapeze hangers, sway braces, cable restraints, and flexible braided connectors across all piping and duct runs as specified.
  4. Segregate inside-building plumbing from Seattle Public Utilities (SPU) side sewer permits, storm detention vaults, and backflow prevention assemblies.

Jurisdiction note: The cited material describes City of Seattle SDCI guidelines. Confirm current requirements and jurisdiction with SDCI and the project design professionals.

Commercial MEP estimating

Related estimating scopes

Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.

HVAC estimating

Heat pump central plants, dedicated outdoor air systems (DOAS), and fan coils.

Plumbing estimating

Commercial plumbing fixtures, rainwater harvesting, and SPU utility boundaries.

Related project-type resources

Back to the Washington regional hubEstimating methodologyTakeoff deliverable guide
Remote bid support

How to prepare a Seattle MEP estimate request

Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.

Include with the request

  • Project address, known permitting jurisdiction, bid deadline, and requested trade scopes.
  • Current architectural and MEP drawings, specifications, schedules, bid instructions, and issued addenda.
  • Scope boundaries and exclusions, including any site utility or fire-protection items that are outside the requested package.
  • Any scope questions or document conflicts you want identified for clarification.

Review and delivery

  1. Check the received document list and revisions against the bid set.
  2. Measure the requested quantities from the applicable plans and schedules.
  3. Flag unclear scope, mismatched schedules, or addenda changes for review.
  4. Use the estimating methodology and sample deliverables pages to review the stated workflow and illustrative file structure.

Read the estimating methodology · See illustrative deliverable structure

Common questions

Seattle estimating FAQs

How does JLG handle the Seattle Energy Code commercial electrification rules?

We itemize specified commercial heat pumps, dedicated outdoor air systems (DOAS), heat recovery wheels, and electric domestic water heaters directly from the drawings.

Does JLG provide SDCI permit plan review or seismic engineering?

No. JLG provides remote quantity takeoff and estimating support based on supplied drawings. Engineering calculations and permits belong to the project engineers.

What information is needed for a Seattle commercial estimate?

Provide the complete architectural and MEP drawings, specifications, equipment schedules, addenda, and any documented SPU utility connection interfaces.

Have a commercial MEP bid set to review?

Send the project scope, current drawings, specifications, and addenda to discuss estimating support.

Contact JLG Estimating