Mechanical piping estimating
Piping takeoffs where drawings define the current scope and package boundary.
JLG Estimating provides remote commercial MEP takeoff and bid estimating support for contractors pricing San Francisco projects. Share the project address, occupancy or tenant area where known, current discipline sheets, specifications, bid boundaries, and addenda so the estimate can follow the supplied package structure.
San Francisco's Department of Building Inspection describes a completeness check for permit applications and review by multiple City permitting departments. For restaurant alterations and new construction, its G-25 information sheet refers to related, separately issued subcontractor permits such as electrical, plumbing, mechanical, sprinkler, and life-safety work. DBI's E-01 sheet identifies specific building and non-residential tenant-improvement project classes subject to electrical plan review. These are project-specific examples; current project documents and the applicable City process determine which path applies.
Jurisdiction note: San Francisco permit guidance varies by project type, occupancy, scope, and application path. This page summarizes selected City documents as estimating intake context; it does not determine code applicability, permit routing, or whether a particular plan review is required.
Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.
Piping takeoffs where drawings define the current scope and package boundary.
Mechanical equipment, ductwork, and system quantities from the issued set.
Fixture and piping quantities aligned with the identified tenant or work area.
Electrical quantities and scope handoffs when included in the estimate request.
Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.
Read the estimating methodology · See illustrative deliverable structure
No. The City materials cited here describe particular application paths and project classes. Confirm the current requirements for the actual scope and permit application.
Provide the address, project or tenant area, current discipline sheets, schedules, specifications, bid scope, addenda, and any separate or deferred packages already identified by the project team.
No. JLG's role is estimating and quantity takeoff from supplied project documents. The responsible design professionals and City reviewers determine permit and code requirements.
Send the project scope, current drawings, specifications, and addenda to discuss estimating support.
Contact JLG Estimating