Electrical estimating
Trade-specific quantities tied to the correct drawing revision.
JLG Estimating provides remote commercial MEP takeoff and bid estimating support for San Jose contractors. Send the complete current plan and specification set, bid scope, addenda, and any referenced supporting reports; the estimating review can flag missing trade sheets and mismatched revisions for clarification.
San Jose's Standard Plan Review guidance, updated 04-12-2026, says each plan-review item should be exported as a separate PDF or PDF/A. The City's SJePlans FAQ says plan sets should be complete before submittal, advises applicants to consult the City if a partial submittal is needed, and limits Upload or Resubmittal tasks to one member of the Applicant group. It also says additional files cannot be uploaded after the applicant selects Upload Complete. For estimating intake, reconcile the received trade files and supporting documents to a controlling revision, and identify missing sheets rather than inferring scope. These instructions apply to the City of San Jose process, not every Santa Clara County jurisdiction.
Jurisdiction note: The cited material describes City of San Jose Standard Plan Review and SJePlans. Verify the current process with the reviewing jurisdiction and project team.
Choose the trade scope that matches the bid package. JLG's estimating work is based on the supplied drawings, specifications, scope, and revisions; the project team remains responsible for design and code decisions.
Trade-specific quantities tied to the correct drawing revision.
Mechanical scope coordinated across trade plans and schedules.
Plumbing scope checked against plans, schedules, and clarifications.
Estimating is performed from the project information supplied by the contractor. A clear package helps keep scope, revisions, and assumptions visible through the takeoff; it does not transfer design or code responsibility to the estimator.
Read the estimating methodology · See illustrative deliverable structure
The City's Standard Plan Review guidance asks for a separate PDF or PDF/A for each plan-review item. Provide the full bid set in the form received and identify the controlling revisions; JLG can flag missing pages or mismatches. The permit reviewer determines whether the submission is complete.
No. Confirm the permitting jurisdiction for the project address; neighboring cities may have different submission processes.
No. JLG can check the received estimating documents for apparent gaps, but the project team and permitting authority determine submittal completeness and acceptance.
Send the project scope, current drawings, specifications, and addenda to discuss estimating support.
Contact JLG Estimating